Note : We Will Not Share Your Information To Any Third Parties.
MRC | Criteria | Characteristic |
---|---|---|
SR-5 | MANUFACTURERS CODE | 06659 |
NTRD | III ENTRY DATE | 88-10-01 |
SR-5 | DESIGN CONTROL REFERENCE | 101532 |
FTLD | III FUNCTIONAL DESCRIPTION | UESED DURING DEPOT LEVEL MAINTENANCE OF THE F112-WR-100 TURBOFAN ENGINE TO DYNAMICALLY INSPECT/TEST THE LUBRICATION AND SCAVENGE LUBE PUMP ASSY; THE TEST SET STAND WILL DRIVE THE LUBE PUMP AND SUPPLY OIL OR CALIBRATION FLUID,SHAFT RPM,FLUID DELIVERY RATE,AND REQUIRED INSTRUMENTATION FOR SPEED,FLOW,TEMPERATURE,AND PRESSURE INDICATIONS |
AGAV | END ITEM IDENTIFICATION | F112-WR-100 ENGINE |
SR-5 | THE MANUFACTURERS DATA | |
FEAT | SPECIAL FEATURES | VOLTAGE 110 VAC;PUMP-EXPLOSIVE PROOF,2 HP,0-20 GAL/MIN.;GAGES-ILLUMINATED,0-500 PSI;HOLDING TANK CAP-25 GALLONS;FILTER SYSTEM-0-100 MICRON;CABINET OUTER SHELL-PLATE ALUMINUM;DIM:7 FT.LG,3 FT.W,6 FT.H;WEIGHT 450 LBS |
“We Proudly Support Intrepid Fallen Heroes Fund that serves United States Military Personal experiencing the Invisible Wounds of War : Traumatic Brain Injury (TBI) and Post Traumatic Stress (PTS). Please visit website (www.fallenheroesfund.org) and help in their valiant effort”. |
Don’t forget That If You’d Ever Like a Quote for Parts Within 15 Minutes or Less, You Can Fill out the Instant RFQ form On this Website’S Homepage.
Request for Quote