Note : We Will Not Share Your Information To Any Third Parties.
MRC | Criteria | Characteristic |
---|---|---|
SR-5 | THE MANUFACTURERS DATA | |
FTLD | III FUNCTIONAL DESCRIPTION | USED TO PROVIDE A PROGRAMMABLE COMPUTER CONTROLLED SYSTEM FOR POST-OVERHAUL PERFORMANCE TESTING ON THE MAIN SECTION OF THE UNIFIED FUEL CONTROL FOR F100 SERIES ACFT ENGINES. THE TEST STATION CONTROL PROVIDES THE OPERATOR WITH MANUAL, SEMI-AUTOMATIC AND AUTOMATIC CONTROL TO THE TEST STAND AND COMPUTER FUNCTIONS AND PROVIDES VISUAL READOUT OF CRITICAL TEST PARAMETERS |
RDAL | III REFERENCE DATA AND LITERATURE | SERD NO. 4461; T.O. 33D4-6-483-1/4 |
FEAT | SPECIAL FEATURES | 115.0 AND 480.0 VAC; 60.0 HZ, 1/3 PHASE; 138.000 IN. L., 126.000 IN W., 78.000 IN. H., 16,000.0 LBS |
SR-5 | DESIGN CONTROL REFERENCE | PWA50004-3 |
SR-5 | MANUFACTURERS CODE | 77445 |
AJAF | III UNPACKAGED UNIT LENGTH | 138.000 INCHES NOMINAL |
AJAG | III UNPACKAGED UNIT WIDTH | 126.000 INCHES NOMINAL |
AJAH | III UNPACKAGED UNIT HEIGHT | 78.000 INCHES NOMINAL |
AGAV | END ITEM IDENTIFICATION | F100-PW-100/200 ACFT ENG |
“We Proudly Support Intrepid Fallen Heroes Fund that serves United States Military Personal experiencing the Invisible Wounds of War : Traumatic Brain Injury (TBI) and Post Traumatic Stress (PTS). Please visit website (www.fallenheroesfund.org) and help in their valiant effort”. |
Don’t forget That If You’d Ever Like a Quote for Parts Within 15 Minutes or Less, You Can Fill out the Instant RFQ form On this Website’S Homepage.
Request for Quote