Note : We Will Not Share Your Information To Any Third Parties.
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
4730-00-232-8023 Item Description: Trap Steam | 4730 | 002328023 | 0 | N | ||
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | U | |||||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
Aa60001a-005-C-003-750-Bz | 1 | 2 | 3 |
MRC | Criteria | Characteristic |
---|---|---|
STEAM | AAJF | THREAD DIRECTIONRIGHT-HAND 1ST END |
STEAM | AJYP | SCREW THREAD SERIES DESIGNATORNPT 1ST END |
STEAM | ALCS | BODY DESIGNANGLE PATTERN |
STEAM | ANNQ | MATERIAL AND LOCATIONBRONZE BODY |
STEAM | APGF | DESIGN TYPETHERMOSTATIC |
STEAM | AXSW | MAXIMUM STEAM WORKING PRESSURE50 0 POUNDS PER SQUARE INCH |
STEAM | BMBL | STRAINERNOT INCLUDED |
STEAM | BZSX | RATED CAPACITY AT MAXIMUM WORKING PRESSURE650 000 POUNDS OF WATER PER HOUR |
STEAM | BZTB | INLETOUTLET CONNECTION SIMILARITYNOT IDENTICAL |
STEAM | BZTC | INLETOUTLET CONNECTION NOMINAL PIPE SIZE0 750 INCHES 1ST END |
STEAM | BZTD | INLETOUTLET CONNECTION TYPEFEMALE IRON PIPE 1ST END |
STEAM | BZTH | INLETOUTLET CONNECTION THREAD PROVISIONTHREADED 1ST END |
STEAM | BZTJ | INLET LOCATION IN RELATION TO INSTALLED POSITIONSIDE |
STEAM | BZTK | OUTLET LOCATION IN RELATION TO INSTALLED POSITIONBOTTOM END |
STEAM | BZTL | GAGE GLASSNOT INCLUDED |
AA60 | AA600 | AA6-1 | AA600004-TYPEII-W |
AA600 | AA6 CCRE | AA6-5S27-13000000A | AA6-13 ITEM 18 |
AA60001-1-B-5 | AA60 | AA60001-1-B-5 | AA600 |
AA60 | AA6-07-1150 | AA6-07-1150 | AA60-3 8 |
“We Proudly Support Intrepid Fallen Heroes Fund that serves United States Military Personal experiencing the Invisible Wounds of War : Traumatic Brain Injury (TBI) and Post Traumatic Stress (PTS). Please visit website (www.fallenheroesfund.org) and help in their valiant effort”. |
Don’t forget That If You’d Ever Like a Quote for Parts Within 15 Minutes or Less, You Can Fill out the Instant RFQ form On this Website’S Homepage.
Request for Quote