Note : We Will Not Share Your Information To Any Third Parties.
MRC | Criteria | Characteristic |
---|---|---|
SR-5 | DESIGN CONTROL REFERENCE | LSD28S4301-1222978PC102-109-110 |
AEVE | KEYWAY QUANTITY | 1 AND 3 |
CTMS | FORWARD END TAPER | 0.125 PER FOOT IN INCHES NOMINAL |
SR-5 | MANUFACTURERS CODE | 80064 |
AGYE | SURFACE FINISH | SMOOTH MACHINED |
AHSU | COUPLING OUTSIDE DIAMETER | 24.375 INCHES NOMINAL |
AKYN | FURNISHED ITEMS AND QUANTITY | STERN TUBE SHAFT KEYS 4 |
BPJZ | USAGE LOCATION | PORT/STARBOARD |
MATL | MATERIAL | STEEL, MIL-S-890 |
SR-5 | THE MANUFACTURERS DATA | |
AARX | INSIDE DIAMETER | 6.000 INCHES MINIMUM AND 9.500 INCHES MAXIMUM |
ABHP | OVERALL LENGTH | 35.109 FEET NOMINAL |
APQB | UNIT TYPE | STERN TUBE SHAFT SECTION |
APZX | PROTECTIVE COVERING TYPE | RUBBER |
ABKV | OUTSIDE DIAMETER | 14.375 INCHES MINIMUM AND 14.406 INCHES MAXIMUM |
ARQS | CONSTRUCTION | HOLLOW |
CPHM | FORWARD END DESIGN | TAPERED |
CPJF | FORWARD END KEYWAY | PROVIDED |
CPJG | AFTER END KEYWAY | NOT PROVIDED |
CPNC | FORWARD END TAPER LENGTH | 1.021 FEET NOMINAL |
CPNF | THREADED FORWARD END | NOT INCLUDED |
CPNK | AFTER END COUPLING DESIGN | INTEGRAL |
CPNM | COUPLING LENGTH | 2.333 FEET NOMINAL |
CPTB | COUPLING THICKNESS | 2.875 INCHES NOMINAL |
CPTD | THREADED AFTER END | NOT INCLUDED |
CPTF | FORWARD BEARING SLEEVE OUTSIDE DIAMETER | 15.625 INCHES NOMINAL |
CPTG | FORWARD BEARING SLEEVE LENGTH | 5.250 FEET NOMINAL |
CPTH | AFTER BEARING SLEEVE OUTSIDE DIAMETER | 15.625 INCHES NOMINAL |
CPTP | AFTER BEARING SLEEVE LENGTH | 4.000 FEET NOMINAL |
CPTS | COVERING LOCATION | ALL EXPOSED SURFACES |
CPTT | FORWARD END TAPER MAJOR DIAMETER | 14.375 INCHES NOMINAL |
ABRR | KEYWAY WIDTH | 2.500 INCHES MINIMUM AND 2.562 INCHES MAXIMUM |
ABRV | KEYWAY DEPTH | 1.062 INCHES NOMINAL |
“We Proudly Support Intrepid Fallen Heroes Fund that serves United States Military Personal experiencing the Invisible Wounds of War : Traumatic Brain Injury (TBI) and Post Traumatic Stress (PTS). Please visit website (www.fallenheroesfund.org) and help in their valiant effort”. |
Don’t forget That If You’d Ever Like a Quote for Parts Within 15 Minutes or Less, You Can Fill out the Instant RFQ form On this Website’S Homepage.
Request for Quote