Note : We Will Not Share Your Information To Any Third Parties.
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5920-00-178-1626 Item Description: Fuse Box | 5920 | 001781626 | 0 | P | ||
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | U | |||||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
9-S-4877-Lalt5 | 6 | 9 | 5 |
MRC | Criteria | Characteristic |
---|---|---|
ABFY | OVERALL DEPTH | 4.500 INCHES NOMINAL |
ABKR | CENTER TO CENTER DISTANCE BETWEEN MOUNTING FACILITIES PARALLEL TO WIDTH | 10.500 INCHES NOMINAL |
ABKW | OVERALL HEIGHT | 22.156 INCHES NOMINAL |
ABMK | OVERALL WIDTH | 12.156 INCHES NOMINAL |
AEBV | UNTHREADED MOUNTING HOLE DIAMETER | 0.500 INCHES NOMINAL |
AESL | STANDARD MOUNTING PATTERN DESIGNATOR | 8 POINT-RECTANGULAR |
AGEJ | SYSTEM FOR WHICH DESIGNED | THREE WIRE THREE PHASE |
AXGY | MOUNTING METHOD | UNTHREADED HOLE |
BFXR | FIRST CENTER TO CENTER DISTANCE BETWEEN MOUNTING FACILITIES PARALLEL TO THE HEIGHT | 6.000 INCHES NOMINAL |
BFXT | SECOND CENTER TO CENTER DISTANCE BETWEEN MOUNTING FACILITIES PARALLEL TO THE HEIGHT | 6.000 INCHES NOMINAL |
BFXX | THIRD CENTER TO CENTER DISTANCE BETWEEN MOUNTING FACILITIES PARALLEL TO HEIGHT | 6.000 INCHES NOMINAL |
BFYC | MAIN LINE MAXIMUM CURRENT RATING IN AMPS | 30.0 |
BGJP | FUSE TYPE AND QUANTITY ACCOMMODATED | 9 CARTRIDGE FERRULE |
CBBL | FEATURES PROVIDED | COVER |
MATT | MATERIAL | STEEL |
SFTT | SURFACE TREATMENT | PAINT |
STYL | STYLE DESIGNATOR | RECTANGULAR, SURFACE MOUNTING |
TEST | TEST DATA DOCUMENT | 81349-MIL-F-24646 SPECIFICATION (INCLUDES ENGINEERING TYPE BULLETINS, BROCHURES,ETC., THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT; EXCLUDES COMMERCIAL CATALOGS, INDUSTRY DIRECTORIES, AND SIMILAR TRADE PUBLICATIONS, REFLECTI |
ZZZK | SPECIFICATION/STANDARD DATA | 81349-MIL-F-24646/4 GOVERNMENT SPECIFICATION |
9-S-3959-L | 9-S-4401-L-REV5 | 9-S-4778L | 9-S-4401-L-REV5 |
9-S-3959-L | 9-S-100-84 | 9-S-2034-L | 9-S-412 |
9 S 2036 L | 9-S-2036-L | 9-S-412 | 9-S-4875-L |
9-S-4799-L REV F | 9-S-4290-LALT12 | 9-S-414 | 9 S 420 |
“We Proudly Support Intrepid Fallen Heroes Fund that serves United States Military Personal experiencing the Invisible Wounds of War : Traumatic Brain Injury (TBI) and Post Traumatic Stress (PTS). Please visit website (www.fallenheroesfund.org) and help in their valiant effort”. |
Don’t forget That If You’d Ever Like a Quote for Parts Within 15 Minutes or Less, You Can Fill out the Instant RFQ form On this Website’S Homepage.
Request for Quote