Note : We Will Not Share Your Information To Any Third Parties.
MRC | Criteria | Characteristic |
---|---|---|
TEXT | General Characteristics Item Description | A COMPLETELY ASSEMBLED 4 PERSON CIRCULAR COLUMN SHOWER UNIT CONSISTINGOF THE FOLLOWING ACCESSORIES AND PARTS,CRES COLUMN W/SHOWER HEADS,MIXINGCHAMBER AND CONTROLS,BOTTOM OF COLUMN SHALL HAVE A TURNED FLANGED BOLTEDTO THE DRAIN,DRAIN EQUIPPED W/A SUMP 11 IN. DIA OR GREATER,TOP OF COLUMNSHALL HAVE A REMOVABLE COVER PLATE,AND THE DIA OF THE TOP SECTION SHALL BE11 IN. OR GREATER,TOP IS ACCESSIBLE TO PIPING CONNECTIONS,FOR A CENTRALLYRISING 2 IN. VENT,AND A 3/4 IN. HOT AND COLD WATER SUPPLY,THE COMBINATIONCAST IRON DRAIN FITTING IS SUITABLE FOR INSTALLATION IN A CONCRETE FLOOR,PROVIDED W/A 3 IN. SPIGOT END WASTE CONNECTION,A 2 IN. SPIGOT END WASTELINE VENT CONNECTION,AND A 2 IN. NPT FEMALE VENT CONNECTION,TO ACCOMMODATEA CENTRALLY LOCATED RISING VENT,COLUMN SHALL BE SEAM WELDED MIN. 6 IN.DIA,6 FT H FROM FLOOR LEVEL TO SHOWER HEADS |
4MS1F1 | 4MS1F1 | 4MS-6MP | 4MS3424-6 |
4MS280 | 4MS-20 | 4MS50SS-412-21211-E-PEO | 4MS9 |
4MS81 | 4MS420 | 4MSC2N-A | 4MS30 |
4MS9-2 | 4MSC2N-316 | 4MS-707FQ1 | 4MS19 |
“We Proudly Support Intrepid Fallen Heroes Fund that serves United States Military Personal experiencing the Invisible Wounds of War : Traumatic Brain Injury (TBI) and Post Traumatic Stress (PTS). Please visit website (www.fallenheroesfund.org) and help in their valiant effort”. |
Don’t forget That If You’d Ever Like a Quote for Parts Within 15 Minutes or Less, You Can Fill out the Instant RFQ form On this Website’S Homepage.
Request for Quote