Note : We Will Not Share Your Information To Any Third Parties.
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
3130-00-708-7860 Item Description: Bearing Unit Ball | 3130 | 007087860 | 0 | N | ||
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | U | |||||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
Scm3 7-16 | 2 | 9 | 5 |
MRC | Criteria | Characteristic |
---|---|---|
ABTD | MOUNTING SLOT WIDTH | 0.9375 INCHES NOMINAL |
ABXV | BORE DIAMETER | 3.4375 INCHES NOMINAL |
ACYB | BASE THICKNESS | 1.3125 INCHES NOMINAL |
ADFX | CENTER TO CENTER DISTANCE BETWEEN MOUNTING HOLES ALONG WIDTH | 11.1250 INCHES NOMINAL |
AFWC | HOUSING HEIGHT | 8.2500 INCHES NOMINAL |
AFWE | HOUSING WIDTH | 15.0000 INCHES NOMINAL |
AGKL | LUBRICATION FITTING TYPE | HYDRAULIC |
AGNF | BASE LENGTH | 4.3750 INCHES NOMINAL |
AGYX | ROLLING ELEMENT GROOVE QUANTITY | 1 |
AGZA | ALIGNMENT TYPE | SELF-ALIGNING |
AGZH | INTERNAL FIT-UP DESIGNATION | STANDARD |
AHZC | ASSEMBLY OVERALL LENGTH | 4.3750 INCHES NOMINAL |
AKRF | SEAL TYPE | LABYRINTH |
AMCL | BLOCK TYPE | FIXED |
ANKF | SEAL LOCATION | BOTH ENDS |
ANKP | HEIGHT FROM BOTTOM OF BASE TO BORE CENTERLINE | 4.0000 INCHES NOMINAL |
CBBL | FEATURES PROVIDED | GROUND ROLLING ELEMENT GROOVE |
CWGR | LUBRICATION FITTING ANGLE FROM HORIZONTAL CENTERLINE | 90.0 DEGREES NOMINAL |
CWGY | ROTATING ELEMENT LOCKING METHOD | DIRECT |
LBMA | LUBRICATION MATERIAL | GREASE |
MATT | MATERIAL | IRON CAST HOUSING |
ABVG | MOUNTING SLOT LENGTH | 2.3750 INCHES NOMINAL |
ANJS | SHAFT END TYPE | OPEN |
ANKK | LOAD CAPABILITY TYPE | RADIAL |
CWJW | MOUNTING HOLE TYPE | SLOTTED |
MATT | MATERIAL | STEEL SEAL AND WOOL SEAL |
STYL | STYLE DESIGNATOR | PILLOW BLOCK, SOLID |
SCM-079-01 | SCM-150-1-01 | SCM-2412K | SCM-1 3 4 |
SCM 1 8 MOD | SCM001061 | SCM-050-03 | SCM-152-2-02 |
SCM001061 | SCM-1 3 4 | SCM-12 | SCM-2 |
SCM-050-02-EMA | SCM-A 3 4 | SCM-450-1-01 | SCM-73 |
“We Proudly Support Intrepid Fallen Heroes Fund that serves United States Military Personal experiencing the Invisible Wounds of War : Traumatic Brain Injury (TBI) and Post Traumatic Stress (PTS). Please visit website (www.fallenheroesfund.org) and help in their valiant effort”. |
Don’t forget That If You’d Ever Like a Quote for Parts Within 15 Minutes or Less, You Can Fill out the Instant RFQ form On this Website’S Homepage.
Request for Quote