Note : We Will Not Share Your Information To Any Third Parties.
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5306-01-265-3355 Item Description: Bolt Close Toleranc | 5306 | 012653355 | 0 | N | ||
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | |||||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
St3m453-6d32 | 2 | 2 | 5 |
MRC | Criteria | Characteristic |
---|---|---|
AAJD | THREAD CLASS | 3A |
AAJF | THREAD DIRECTION | RIGHT-HAND |
AASA | THREAD LENGTH | 0.490 INCHES MINIMUM AND 0.557 INCHES MAXIMUM |
AASB | FASTENER LENGTH | 2.500 INCHES MINIMUM AND 2.547 INCHES MAXIMUM |
AASK | HEAD STYLE | DOUBLE HEXAGON |
AASU | HEAD HEIGHT | 0.200 INCHES MINIMUM AND 0.220 INCHES MAXIMUM |
AATB | WIDTH BETWEEN FLATS | 0.564 INCHES MAXIMUM |
AAUR | GRIP DIAMETER | 0.3740 INCHES MINIMUM AND 0.3745 INCHES MAXIMUM |
AAWB | SHANK UNTHREADED HOLE DIAMETER | 0.106 INCHES MINIMUM FIRST HOLE AND 0.111 INCHES MAXIMUM FIRST HOLE |
AHYM | NOMINAL THREAD DIAMETER | 0.375 INCHES |
ANEE | GRIP LENGTH | 1.990 INCHES MINIMUM AND 2.010 INCHES MAXIMUM |
CMLP | THREAD QUANTITY PER INCH | 24 |
CQBC | MINIMUM TENSILE STRENGTH | 125000 POUNDS PER SQUARE INCH |
CRZS | DISTANCE FROM HEAD LARGEST BEARING SURFACE TO SHANK HOLE CENTER | 2.375 INCHES MINIMUM FIRST HOLE AND 2.432 INCHES MAXIMUM FIRST HOLE |
MATT | MATERIAL | STEEL COMP XM-13 OVERALL |
MDCL | MATERIAL DOCUMENT AND CLASSIFICATION | AMS 5629 ASSN STD SINGLE MATERIAL RESPONSE OVERALL |
SFTT | SURFACE TREATMENT | PASSIVATE OVERALL |
STDC | SURFACE TREATMENT DOCUMENT AND CLASSIFICATION | QQ-P-35 FED SPEC SINGLE TREATMENT RESPONSE OVERALL |
THSD | THREAD SERIES DESIGNATOR | UNJF |
ST30 | ST3-28 | ST3-120 | ST30 |
ST3.5-WFV-235-W2 8KPORM5PCT | ST3-48 | ST3-118-01 | ST3 8-16X3 4 2701 |
ST3-1509 | ST3-120 | ST3-48 | ST30 |
ST3.5-WFV-235-W2 8KPORM5PCT | ST3.5-WFV-235-W2 8KPORM5PCT | ST3-120 | ST3-24 |
“We Proudly Support Intrepid Fallen Heroes Fund that serves United States Military Personal experiencing the Invisible Wounds of War : Traumatic Brain Injury (TBI) and Post Traumatic Stress (PTS). Please visit website (www.fallenheroesfund.org) and help in their valiant effort”. |
Don’t forget That If You’d Ever Like a Quote for Parts Within 15 Minutes or Less, You Can Fill out the Instant RFQ form On this Website’S Homepage.
Request for Quote